Building permit design of parking places and approach road to aski station “Czarna Góra”

Employer:
„Czarna Góra” S. A.


Localization:
Sienna


Design stage:


Date of completion:
June – September 1996


Technical data:
Overall task area 27 000 m2


Scope of design:
The task requires design of a parking bays for approximately 450 private vehicles and 20 coaches, approach roads and link roads to ski lifts. During the design process emphasis are placed on construction of pavements for vehicles, proper arrangement of parking areas, marking of parking places.
Car parks are designed to minimize the volume of earth works preserving the existing trees.
The difference between levels of entrance and exit from the car park reaches 30,50 m. The entrance to the car park through the road no. 393 between Bystrzyca Kłodzka and Stronie Śląskie.